Mining Engineer CDR Example: Mid Level (Coal and Platinum Mining)
Mining Engineer · Drill and blast engineer
About this CDR
Three Career Episodes from a mid level mining engineer: a mine plan, fleet calculation and production schedule to mine coking coal separately for a new steelmaking client; drilling patterns, blast designs, explosives ordering and post-blast analysis for overburden and coal at a mine restarting operations; and new loading bay and panel designs, grade control and post-blast analysis to raise underground production by 2% without extra equipment at a platinum group metals producer. This CDR was assessed and approved by Engineers Australia under the Professional Engineer (PE) competency standard.
How to use this CDR
Use this CDR as a guide to the structure, technical detail and writing style that Engineers Australia assessors accept, then write your own Career Episodes about your own projects, in your own words. This CDR was written entirely by a human writer, with no AI tools used at any stage.
Complete CDR: Career Episodes, Summary Statement and CPD
You receive all five documents below as editable Word files.
Coking Coal Mine Planning
Studied the coal seam and the client specifications, redesigned the mining of the seam so coking coal was mined separately, calculated fleet requirements and prepared overburden and coal production schedules.
Drill and Blast Design for Coal and Overburden
Designed drilling patterns and blast plans for sandstone, shale and coal with specialist software, ordered explosives through a BOQ and quotation comparison, and followed national explosives and mine safety regulations.
Underground Production Optimisation
Designed loading bays and wider production panels with CAD tools, controlled drilling angles and grade, ran post-blast analysis and calculated monthly explosives needs to lift production by 2% with no extra equipment.
Summary Statement
Maps all 16 Professional Engineer competency elements (PE1.1 to PE3.6) to the exact paragraphs in the three Career Episodes where it is demonstrated, so the assessor can check each element quickly.
Continuing Professional Development (CPD)
A list of the professional development completed since graduation, such as courses, training, conferences, seminars and self-study, set out in the format Engineers Australia asks for.
Tools and Technical Skills
How you receive your CDR
After payment we email the complete CDR to the email address you used at checkout, as editable Word files. Files are sent shortly after payment, within a few hours at most. If you cannot find the email, please check your spam folder or write to cdr@cdrsample.com.

